Construction details library for concrete, steel and mixed structures. Includes foundations, from foundation pads to pile caps, mat foundations, walls and shear walls.
Construction details
© CYPE Ingenieros, S.A. in collaboration with  solo arquitectura
 
In English

En castellano
En català
En galego
Adaptado para Argentina
Adaptado para México
Em português
Adaptado para o Brasil
En Français
In Bulgarian
Construction Details: steel, concrete and composite
Construction details order
Base of column on top of wall beam of slurry wall.
Cast against the earth.
CCP001-C


  • The depth of the top of wall beam should be greater or equal to 2/3 of the anchorage length Lb.

  • The floor slab will normally be embedded in the top of wall beam, which requires that the beam be constructed in two stages.