Construction details
© CYPE Ingenieros, S.A.
Technical Software
company In Spain
(certified)
ISO 9001:2008
Construction Details Library
Construction Details: steel, concrete and composite
CCM: Retaining walls
Projecting column in wall.
CCM011
In cases where the column has a dimension perpendicular to the wall such that its exterior face is flush with the soil face or penetrates the wall by more than half its width, additional U bars are not required.