Intermediate wall interface with one-way slab over recess.
Parallel joists.
CCM104
Consider the joint mechanically as a simple support.
It is necessary to establish the wall's support mechanism for the earth pressures since it is not advisable that they rely exclusively on the compression layer of the floor slabs. It is recommended that detail EHU020 be included in the floor plan.
It is recommended that a 1/4" thick. neoprene band be used at the slab joint/recess.