Construction details
© CYPE Ingenieros, S.A.
Technical Software
company In Spain
(certified)
ISO 9001:2008
Construction Details Library
Construction Details: steel, concrete and composite
CCM: Retaining walls
Top of wall interface with flat slab.
CCM702
The exterior reinforcement of the wall should be bent and penetrate the compression layer for a length greater or equal to 20 in.
The 4#5 at the top of the wall are recommended to avoid shrinkage cracking and to strengthen the resistance of the wall-beam mechanism.