Construction details
© CYPE Ingenieros, S.A.
Technical Software
company In Spain
(certified)
ISO 9001:2008
Construction Details Library
Construction Details: steel, concrete and composite
CCP: Walls
Base of column on top of wall beam of slurry wall.
With lateral formwork.
CCP001-B
The depth of the top of wall beam should be greater or equal to 2/3 of the anchorage length Lb.
The floor slab will normally be embedded in the top of wall beam, which requires that the beam be constructed in two stages.