During construction of the wall it is recommended that an easy-to-remove element be placed at the correct level to allow for the placement of the slab after its removal; thus avoiding chopping, which always results costly.
The chopping of the wall in an area of considerable lateral pressures will weaken the wall. To adopt this solution will require a capacity check of the wall in the affected sections and a study into the construction by alternating panels.