Construction details
© CYPE Ingenieros, S.A.
Technical Software
company In Spain
(certified)
ISO 9001:2008
Construction Details Library
Construction Details: steel, concrete and composite
CCP: Walls
Intermediate interface in slurry wall through dowels.
One-way floor slab.
Lattice joists.
CCP308
Although the connection allows absorbing small negative moments, it is recommended that it be considered as a simple support for analysis purposes.
The #5 bars work in shear.
The values given correspond to floors in buildings with a total load not exceeding 200 psf and spans not greater than 20 ft.