Construction details
© CYPE Ingenieros, S.A.
No.1 Technical Software
company In Spain
(certified)
ISO 9001:2000
Construction Details Library
Construction Details: steel, concrete and composite
CSZ: Pad Foundations
Elevator pit.
CSZ005
The slab on grade must end against the pit walls with a sealed construction joint.
If it is placed on top of the walls, the slab on grade requires formwork at its edges.