Construction details
© CYPE Ingenieros, S.A.
Technical Software
company In Spain
(certified)
ISO 9001:2008
Construction Details Library
Construction Details: steel, concrete and composite
CSZ: Pad foundations
Start of column at elevator pit.
CSZ006
The top of the pit slab must coincide with the required pit depth to avoid serviceability problems.
The slab on grade must end against the pit walls with a sealed construction joint.