Construction details library for concrete, steel and composite structures. Includes foundations, from pad footings to pile caps, mat foundations, walls and shear walls.

Construction details

© CYPE Ingenieros, S.A.

 

In English

En castellano

En català

En galego

Adaptado para Argentina

Adaptado para México

Em português

Adaptado para o Brasil

En français

In Italian

In Bulgarian

In Chinese

Construction Details: steel, concrete and composite

 
   

Semi-Rigid beam-column (2 channels tied together) connection in column line.

   

EAG818

   


  • In general, it is not advisable to count on perfect fixity in steel connections, save if undeformable stiffeners are provided.

  • The thickness and spacing of the transverse plates for the built-up column must be calculated.

  • As a reference, their thickness is in the order of 5/16 in., with a width of 6 in., and a spacing between 2 ft. and 3 ft.