Construction details library for concrete, steel and composite structures. Includes foundations, from pad footings to pile caps, mat foundations, walls and shear walls.

Construction details

© CYPE Ingenieros, S.A.

 

In English

En castellano

En català

En galego

Adaptado para Argentina

Adaptado para México

Em português

Adaptado para o Brasil

En français

In Italian

In Bulgarian

In Chinese

Construction Details: steel, concrete and composite

 
   

Transition to cantilevered flat slab of lesser depth aligned at the top.

Waffle slab.

Lost filler blocks.

   

EHR529

   


  • The top reinforcement for negative bending in the slab must penetrate the compression layer of the floor slab with the minimum required anchorage length. As a practical and safe reference, in the absence of a precise analysis, the anchorage length may be taken as the length of the cantilever.