Construction details
© CYPE Ingenieros, S.A.
Technical Software
company In Spain
(certified)
ISO 9001:2008
Construction Details Library
Construction Details: steel, concrete and composite
EHR: Waffle floor slabs
Transition to cantilevered flat slab of lesser depth aligned at the bottom.
Waffle slab.
Lost filler blocks.
EHR530
The hooks of the negative bending reinforcement in the slab will be bent up or down depending on the available geometry.
The infilled zone that surrounds the beam must be equal or greater than the anchorage length of the negative bending bars in the slab.