Construction details library for concrete, steel and composite structures. Includes foundations, from pad footings to pile caps, mat foundations, walls and shear walls.

Construction details

© CYPE Ingenieros, S.A.

 

In English

En castellano

En català

En galego

Adaptado para Argentina

Adaptado para México

Em português

Adaptado para o Brasil

En français

In Italian

In Bulgarian

In Chinese

EHZ: Stairs

EHZ098

  

Table of properties. Reinforced concrete stairs. (Table Type I).

EHZ099

  

Table of properties. Reinforced concrete stairs. (Table Type II).

EHZ001

  

Start at mat foundation.

EHZ002

  

Start at spread footing.

EHZ003

  

Start at stair footing.

EHZ004

  

Start at grade beam.

EHZ005

  

Start at beam embedded in floor slab.

EHZ006

  

Start upset from floor slab over bearing wall.

EHZ007

  

Start upset from floor slab over concrete bearing wall.

EHZ008

  

End of run at landing.

EHZ009

  

Bearing wall support at intermediate landing (Type B).

EHZ010

  

Bearing wall support at intermediate landing (Type A).

EHZ011

  

Free edge at landing.

EHZ012

  

Start of run at landing.

EHZ013

  

Landing broken by risers.

EHZ014

  

Section of continuous stair with curved plan.

EHZ015

  

End of run at landing with risers.

EHZ016

  

Step in landing broken by risers.

EHZ017

  

Start of run in landing with risers.

EHZ018

  

End of run in landing with riser.

EHZ019

  

Step in landing broken by risers.

EHZ020

  

Start of run in landing with rise.

EHZ021

  

Run supported on an existing vertical wall through dowels.

EHZ022

  

Landing supported on existing vertical walls through dowels.

EHZ023

  

Start of run in existing vertical wall through dowels.

EHZ024

  

Start of continuous stair curved in plan at beam embedded in floor slab.

EHZ025

  

End of continuous stair curved in plan at beam embedded in floor slab.

EHZ026

  

Bearing wall support.

EHZ027

  

Concrete wall support.

EHZ028

  

Suspended support of landing with tie bars in concrete wall.

EHZ029

  

Suspended support of landing with tie bars in partition wall.

EHZ030

  

End of run at beam embedded in floor slab.

EHZ031

  

Start of run at beam embedded in floor slab with riser.

EHZ032

  

Stair reinforcement schedule.

Construction Details: steel, concrete and composite