Construction details library for concrete, steel and mixed structures. Includes foundations, from foundation pads to pile caps, mat foundations, walls and shear walls.
Construction details
© CYPE Ingenieros, S.A. in collaboration with  solo arquitectura
 
In English

En castellano
En català
En galego
Adaptado para Argentina
Adaptado para México
Em português
Adaptado para o Brasil
En Français
In Bulgarian
EHZ: Stairs
EHZ098
  
Table of properties. Reinforced concrete stairs. (Table Type I).
EHZ099
  
Table of properties. Reinforced concrete stairs. (Table Type II).
EHZ001
  
Start at mat foundation.
EHZ002
  
Start at spread footing.
EHZ003
  
Start at stair footing.
EHZ004
  
Start at grade beam.
EHZ005
  
Start at beam embedded in floor slab.
EHZ006
  
Start upset from floor slab over bearing wall.
EHZ007
  
Start upset from floor slab over concrete bearing wall.
EHZ008
  
End of run at landing.
EHZ009
  
Bearing wall support at intermediate landing (Type B).
EHZ010
  
Bearing wall support at intermediate landing (Type A).
EHZ011
  
Free edge at landing.
EHZ012
  
Start of run at landing.
EHZ013
  
Landing broken by risers.
EHZ014
  
Section of continuous stair with curved plan.
EHZ015
  
End of run at landing with risers.
EHZ016
  
Step in landing broken by risers.
EHZ017
  
Start of run in landing with risers.
EHZ018
  
End of run in landing with riser.
EHZ019
  
Step in landing broken by risers.
EHZ020
  
Start of run in landing with rise.
EHZ021
  
Run supported on an existing vertical wall through dowels.
EHZ022
  
Landing supported on existing vertical walls through dowels.
EHZ023
  
Start of run in existing vertical wall through dowels.
EHZ024
  
Start of continuous stair curved in plan at beam embedded in floor slab.
EHZ025
  
End of continuous stair curved in plan at beam embedded in floor slab.
EHZ026
  
Bearing wall support.
EHZ027
  
Concrete wall support.
EHZ028
  
Suspended support of landing with tie bars in concrete wall.
EHZ029
  
Suspended support of landing with tie bars in partition wall.
EHZ030
  
End of run at beam embedded in floor slab.
EHZ031
  
Start of run at beam embedded in floor slab with riser.
EHZ032
  
Stair reinforcement schedule.
Construction Details: steel, concrete and composite
Construction details order