Construction details
© CYPE Ingenieros, S.A.
Technical Software
company In Spain
(certified)
ISO 9001:2008
Construction Details Library
Construction details of inclined slabs
FIR: Sloped floor slabs. Waffle slabs
Elevation change with level difference greater than the depth of the slab at an intermediate span.
Bottom flat slab with waffle slab.
Lost form.
FIR555
NOTE: It is dangerous and thus discouraged that a change in elevation be carried out in the positive bending zone.